Certification of original
Mainframe naked in container, electrical control box in plywood cases (Non fumigation) then in conta
30% T/T as advance payment when sign the contract, 70% T/T as balance payment before delivery or 100%
10 sets per Month
Heavy Duty
5 Tons
0.05-1 rpm
Welding auxiliary equipment
Heavy Duty Loading Work-piece